South Seattle Data Center

Contact Sales

South Seattle
Location

12101 Tukwila International Blvd.
Seattle, Washington 98168 

Building

  • Seismic Zone 3 construction
  • 45,600 sq. ft. facility
  • Outside the 500 year flood plain and significant rising water
  • Slab and 18″ raised floor with underfloor leak and smoke detection
  • Antenna roof rights available

Environment

  • VESDA smoke detection
  • FM 200 clean agent gas suppression fire system
  • Pre-action dry pipe fire suppression systems in datacenter
  • RFID monitoring with threshold SLA notifications

Security

  • 24/7 key card access
  • 24/7 camera surveillance and 90 day video retention
  • Closed circuit monitoring with CCTV in two NOCs
  • Controlled access

Amenities

  • Workspace
  • Wi-Fi
  • Private office suites available
  • Conference rooms
  • Kitchen
  • Free Parking

Network

  • Carrier neutral facility Controlled Meet-Me-Room
  • Diverse selection of Tier 1 and Tier 2 providers with onsite point of presence
  • Fully meshed Cisco based network with redundant fiber ring core
  • Multiple 10 Gig-E connections to the Internet
  • Private 10G dark fiber ring between all data center locations and Westin
  • Direct connections available to all major regional and global carriers with a point of presence in Westin
  • Diverse fiber entry points and fiber risers
  • Direct connection with the Seattle Internet Exchange (SIX)
  • Shortest distance to Asia from North America
  • Connectivity options to Westin

Carriers

  • Sprint
  • Verizon
  • Integra
  • AT&T

Test and Certifications

  • SSAE 16 SOC 2 TYPE II
  • Diesel generators load tested and inspected quarterly (4.0MW)
  • On-site fuel polishing systems
  • Quarterly sampling and inspection of all diesel fuel for generators tanks

Power

  • 6MW Capacity
  • AC and DC protected power
  • 3 diesel generators total 4.0 MW
  • Permanently installed load banks
  • True “A” and “B” UPS
  • High density cabinets up to 15kW

UPS Options

  • 110, 208 Volt AC
  • Large DC 48Volt UPS plant
  • Gas fire suppression in all UPS rooms

Standby Power

  • 2 days of fuel for generators SLA contracts with multiple providers for emergency fuel

Cooling

  • Cooling Redundancy: N+1

Energy Efficiency

  • Ample hydro-electric power
  • Low PUE facility
  • 96% of energy derived from clean power
  • Region’s cool ambient air provides “free” cooling 90% of the year
  • Lowest-average industrial electricity rates

On-Site Support

  • 24/7 NOC technicians
  • 24/7 monitoring
  • On-site engineers